Design for Test (DFT)

Design for Test (DFT)

Without proper DFT analysis can lead to inflated test costs, including but not limited to:

  • Expensive fixture cost due to improper allocation of test points.
  • Unnecessary fixture rework.
  • Insufficient test coverage leading to increased test escapees.
  • Expensive ECN rework costs

However, early DFT strategy can reduce overall test costs in your product life cycle. What you will get:

  • Early advice on test strategies.
  • Analysis report on your new design to maximize test coverage.
  • Test points optimization to reduce fixture cost.
  • Preliminary Test Coverage.

What we need from you:

  • CAD
  • Schematics

Apart from the above standard DFT reports, we can also work with your design team to help you create or refine your DFT guidelines.

Phased approach to DFT can provide effective and comprehensive solutions in the prototyping, thereby giving you quicker time to full production run.

We adopt win-win strategy for all our customers.